Murram Works – 8km with Box Culvert Construction
Grand Construction Limited undertook the rehabilitation of the Kasanje–Sokolo Road, covering an 8-kilometer stretch of rural roadway with the construction of a reinforced box culvert. The project was designed to enhance transportation efficiency, reduce flood-related disruptions, and promote agricultural and trade access within the region.
Project Highlights:
-
Location: Kasanje–Sokolo, Uganda
-
Scope: Road Rehabilitation & Box Culvert Installation
-
Length: 8 Kilometers
-
Client: [Insert Client Name]
-
Status: [Completed / Ongoing]
-
Completion Date: [Insert Date]
This critical infrastructure upgrade involved murram grading and compaction, drainage improvement, and installation of a 1 No. box culvert, significantly improving water flow management and road durability, especially during the rainy season.
Key Deliverables:
-
Clearing and preparation of the 8km road corridor
-
Murram layer compaction and reshaping
-
Installation of a box culvert for flood mitigation
-
Drainage grading and embankment stabilization
-
Final finishing and quality assurance
Impact: A safer, more reliable road network that connects communities and boosts local economic activities by improving year-round accessibility.
Would you like help designing how these project profiles should appear visually (e.g., layout for Elementor using images, icons, or collapsible tabs)?